Electrical wires being installed on the surface of the bales. Six inches of pumice is being spread for floor insulation. Three inches of road base will be tamped on top of it and then a half-inch layer of clay and sand will be troweled on. The start of the woodstove's adobe wall. Stones and clay balls thicken out a thin reed wall. Ready for the sun room addition. Clay sub-floor